Advice from people who have to live with it.
Strategy, architecture review, due diligence, and modernization roadmaps — delivered by senior engineers, not a slide team.
How we approach it consulting.
Most strategy decks fail because the people writing them have not had to maintain a system in five years. We do this work the other way around: every consultant on a MayaLogic engagement is a practising engineer who will be on the hook for the consequences.
The output is short, opinionated, and actionable. Recommendations come with a delivery plan, a team shape, and the risks called out — not a 60-page document that hedges every position.
Best fit for
- Teams with a measurable product, operational, or platform outcome.
- Leaders who want senior engineers accountable for delivery decisions.
- Systems where launch quality, security, and handover matter commercially.
Not a fit for
- Staffing-only requests where nobody owns outcomes or technical quality.
- Projects that need the cheapest possible build, regardless of maintainability.
- Big-bang programmes with no room for discovery, proof, or staged cutover.
What you get in week one
- A named technical lead and communication rhythm.
- Outcome map, risk register, and first-slice recommendation.
- Access plan, repository/cloud checklist, and demo schedule.
Concrete artefacts, not just engineering activity.
Every engagement leaves your team with working software and the operational assets needed to own it: architecture records, dashboards, runbooks, and handover notes.
IT Consulting roadmap with outcome metrics and assumptions
Architecture decision records and integration contracts
Delivery dashboard covering scope, risks, burn, and demo outcomes
Production code, tests, CI/CD, and environment documentation
Security, accessibility, and performance checklist
Runbooks, handover notes, and operating model recommendations
Start small, build fixed-scope, embed a squad, or stay for support.
Discovery
One to two weeks to shape the outcome, risks, and plan.
Fixed-scope build
Milestone-led delivery for a well-defined product or platform slice.
Embedded squad
A senior cross-functional team working inside your cadence.
Ongoing support
Operations, optimization, roadmap delivery, and handover support.
A typical path from first workshop to production.
Week 1
Discovery, access, and risk map
Align on the it consulting outcome, validate constraints, and define the first demo-able slice.
Weeks 2–3
Architecture and first working slice
Stand up the delivery environment, agree technical decisions, and ship the first thin slice to staging.
Weeks 4–8
Build, measure, and de-risk
Weekly demos, production-shaped infrastructure, testing, observability, and stakeholder feedback loops.
Launch
Harden, cut over, and hand over
Security, performance, accessibility, go-live runbook, and a practical ownership handover.
Risk reduction is part of the scope.
We make risks visible early: security posture, data migration, accessibility, performance, operational handover, and ownership. The risk register is reviewed in demos alongside working software.
A short list, so the engagement starts with momentum.
You do not need a finished spec. You do need a few things in place so senior engineers can move quickly instead of waiting.
- A named decision-maker who can prioritize the it consulting scope
- Access to the people who understand the current process and its edge cases
- Access to systems, data samples, and environments (read-only is fine to begin)
- The constraints that matter: compliance, deadlines, budget envelope, integrations
- A definition of success we can measure — even a rough one to sharpen together
The expensive failure modes we have seen before.
Most of the cost in this work comes from a handful of avoidable errors. We design the engagement to keep you out of them.
- Scoping the it consulting too broadly before anything ships and learns
- Treating security, accessibility, and operability as launch-day work
- Building on assumptions that were never validated with real users or data
- No clear owner, so decisions stall and momentum quietly drains away
- Skipping the handover, leaving a system nobody on your team wants to touch
Indicative shapes, so you can budget before we talk.
Every project is scoped to its outcome, so these are guides, not quotes. They give you a realistic sense of duration, team shape, and where the value lands.
Discovery sprint
1–2 weeksValidate the outcome, map risks, and leave with a costed plan and a fixed first milestone.
Team: 1 senior engineer + part-time architect
Fixed-scope build
6–12 weeksA well-defined product or platform slice delivered to production against agreed milestones.
Team: 2–4 senior engineers + design as needed
Embedded squad
3+ monthsA cross-functional team working inside your cadence, owning delivery alongside your people.
Team: Lead, senior engineers, product/design
No exact budget required to start. A 30-minute scoping call turns these shapes into a firm plan and a fixed first milestone.
The problems this work exists to solve.
Before we talk solutions, we get specific about what is actually costing you time, money, or sleep. These are the patterns we see most often.
Delivery that stalls before it ships
Roadmaps slip because the team is firefighting production, onboarding takes months, or the last vendor left behind code nobody wants to touch. Momentum, not ambition, is the constraint.
Systems that fight the business
The software was shaped around assumptions that no longer hold. Every new requirement means a workaround, and the cost of change keeps climbing while the roadmap keeps shrinking.
Risk that surfaces too late
Security, scale, and reliability get treated as launch-day problems. By the time they show up in an incident or an audit, the cheap window to fix them has already closed.
What you can expect.
Architecture review
Deep, opinionated review of the systems you have — what to keep, what to refactor, what to retire, in what order.
Technology strategy
A two- to three-year roadmap that ties technical investment to commercial outcomes, in plain language for the board.
Due diligence
Investor- and acquirer-grade technical due diligence — code, architecture, team, security, and operating risk.
Vendor and build/buy decisions
Independent advice on platform choices, vendor selection, and the eternal build/buy question.
Modernization roadmaps
Strangler-pattern programmes with measurable cutovers, not lift-and-shift theatre.
Fractional CTO
Embedded senior leadership for teams between technical leaders — usually three to six months, occasionally longer.
How we deliver.
Step
Discovery & scoping
One to two weeks. We confirm the outcome, the constraints, the risks, and the smallest first slice worth shipping.
Step
Architecture & plan
A short, opinionated document covers the system shape, delivery plan, named team, and the success metrics by week.
Step
Build in slices
Working software demoed every week. CI from day one. Staging environment from day one. No big-bang reveal at the end.
Step
Harden & launch
Performance, security, accessibility, and observability passes before go-live. Runbooks and handover that match.
Step
Operate & evolve
Stay on as long as it makes sense. Continuous improvement, capacity changes, and the next initiative when you’re ready.
The stack, give or take.
We pick per problem, not per pitch. These are the tools we reach for most often on this kind of work.
TOGAF
C4 model
EventStorming
Wardley Mapping
AWS Well-Architected
Azure CAF
GCP Architecture Framework
NIST CSF
ISO 27001
DORA metrics
Where this work earns its keep.
The same engineering discipline, tuned to the regulation, scale, and accuracy demands of your sector.
Proof, in production.
We would rather show you a result than describe a capability. Here is a recent engagement where this work moved a number that mattered to the business.
Common questions.
- Architecture reviews and due diligence are usually two to four weeks. Strategy and modernization roadmaps run six to ten. Fractional CTO arrangements are open-ended.
- Often, but not by default. The recommendation has to stand up whether or not we are the team to execute it. Many clients use a different partner for execution and that is a fine outcome.
- Yes, and we frequently do. Translating engineering reality into commercial language is much of the job.
- Yes — both sell- and buy-side. We can produce a credible diligence pack in two weeks and a deep one in four.
Ready when you are
Let’s talk about your it consulting project.
Tell us what you are trying to ship. A senior engineer will follow up within one business day.
- Avg. engineer experience
- 9+ yrs
- Response time
- 1 day
- Code & IP ownership
- 100%